INDEPENDENT POWER. ENGINEERED.DUBAI, UAE · ACROSS THE GCC

Generator rental in Dubai & the UAEPower for
what comes next.

From a single generator to an integrated power plant — engineered around your project.

Discuss your project
POWERING YOUR NEXT PROJECTExplore solutions

About SINTAQA in brief

SINTAQA Power Solutions (SINTAQA FZCO) is a Dubai-based power generation company providing high-capacity generator rental, temporary and permanent power plants, gas power generation, electrical infrastructure and O&M across the UAE and the GCC. The rental fleet is built on new containerised 1,250 kVA diesel generators (Cummins engine, Stamford alternator), each switchable between 50 Hz and 60 Hz and able to synchronise into multi-megawatt power plants with step-up transformers, fuel storage and cabling. Equipment is mobilised from our yard in KIZAD, Abu Dhabi; recent projects include an island power plant on Dalma Island and 60 Hz barge power at Hudayriat Island.

SINTAQA containerised 1250 kVA generators transported for project deployment

From concept to continuous power

Every SINTAQA project begins with understanding our client's energy needs and ends with a fully operational, reliable power system.

We manage the entire process, from engineering design and equipment selection to installation, commissioning and long-term service, from a single containerised generator to synchronised multi-megawatt plants.

About SINTAQA

From energy source to your switchboard

One team for the whole chain: energy supply, generation, electrical connection and round-the-clock operation on site.

Diesel
Natural gas
HFO
Solar
SINTAQA power
Construction
Events
Oil & gas
Commercial buildings

Generator rental.
Power plants. O&M.

One engineering partner.
A complete spectrum of power solutions.

SINTAQA C1250 containerised generator with Cummins engine and Stamford alternatorSINTAQA / DIESEL RENTAL

Power engineered for the project.

Available containerised 1,250 kVA modules, synchronised multi-unit plants and purpose-built fleets procured for suitable long-term projects.

Large-scale powerLong-term projects50/60 Hz
Explore solution
Flexible by design.

Short-term and long-term rental, equipment sale, EPC, O&M, PPA and BOOT — structured around the project.

Why SINTAQA ↗

Turn gas into dependable power

One integrated power system engineered around the available fuel and the customer's load. Gas power generation →

  1. 01Gas networkSupply at site boundary
  2. 02Pressure regulationMetering and PRMS
  3. 03Gas conditioningFiltration, heating, treatment
  4. 04Gas generationGas engine gensets
  5. 05Electrical infrastructureTransformers, switchgear
  6. 06Consumer / gridIndustrial load or export

Pipeline natural gas, regulated and conditioned, feeding a modular gas-engine plant at the point of use.

Our Experience

Proven power across industries.

Over the years, SINTAQA has implemented power projects for industrial, oil & gas, and infrastructure clients across the Middle East. Our portfolio covers diesel, gas and hybrid power solutions, from temporary rental setups to fully integrated turnkey concepts.

About Us

Trusted across the UAE.

Rental power and fuel equipment for utilities, government, industrial and oil & gas clients.
01DALMA ISLAND, ABU DHABI

Client AMPC

Island power plant

A complete rental power plant on Dalma Island, offshore Abu Dhabi: generators, step-up transformer, bulk fuel storage and cabling, commissioned by a TAQA-approved engineer.

  • 3 × 1,250 kVA generators
  • 5 MVA transformer
  • 68,000 L fuel storage
  • TAQA-approved commissioning
Read the case study →
02HUDAYRIAT ISLAND, ABU DHABI

Client NMDC Energy

Barge-mounted power, 60 Hz

Two 1,250 kVA generators configured for 60 Hz on a barge that links the construction site on Hudayriat Island to the mainland. Construction traffic crosses the barge, and it swings open to let vessels pass.

  • 2 × 1,250 kVA generators
  • 60 Hz
  • Marine installation
  • Construction
Read the case study →
03DUBAI

Client Al Shirawi

Power supply for a school

Two 1,250 kVA generators keeping a school in Dubai powered, with fuel supply, connection and on-site support.

  • 2 × 1,250 kVA generators
  • Education
  • Continuous supply
04ABU DHABI

Client TAQA Transmission

Fuel storage for transmission sites

Rental diesel storage tanks for TAQA Transmission sites in Abu Dhabi.

  • Self-bunded fuel tanks
  • Utilities

Every project includes fuel tanks, power cabling, connection, mobilisation and commissioning.

Energy & utilities

  • ADNOCAbu Dhabi National Oil Company
  • TAQAAbu Dhabi National Energy Company
  • DEWADubai Electricity & Water Authority
  • Dolphin EnergyGas production & pipeline
  • EmaratEmirates General Petroleum Corporation
  • NMDC EnergyOnshore & offshore EPC

Government & infrastructure

  • Etihad RailUAE national railway
  • RTARoads & Transport Authority, Dubai
  • Dubai MunicipalityGovernment of Dubai
  • KEZADKhalifa Economic Zones Abu Dhabi
  • MiralYas Island destinations

Construction & industry

  • L&TLarsen & Toubro
  • ALECEngineering & contracting
  • TrojanTrojan Construction Group
  • TargetTarget Engineering Construction
  • Al ShirawiAl Shirawi Group
  • Al MasaoodAl Masaood Group
  • Nestlé MENAFood & beverage manufacturing

Authorised technology & equipment partners.

Manufacturers and technology companies SINTAQA works with as an authorised partner for generation, electrical and engine equipment.
  • Caterpillar
  • Leroy-Somer
  • Cummins
  • MAHLE
  • ABB
  • DENSO
  • Schneider Electric
  • Jenbacher
  • OPRA Turbines
  • Perkins
  • Weichai

Clients & vendor registrations

Registered with multiple major organisations across the UAE and GCC. Each organisation is shown with its actual relationship to SINTAQA.

  • NMDC Group Client (NMDC Energy) · registered vendor
  • TAQA Client (TAQA Transmission) · registered vendor
  • ADNOC Registered vendor · approved equipment
  • Emarat Registered vendor · pipeline gas supplier on joint gas-to-power projects

Where we work

Based in the UAE. Delivering across the GCC.

HEAD OFFICEDubaiMetropolis Tower, Office 2116, Business BayEngineering, sales and project management
EQUIPMENT YARDKIZAD, Abu DhabiKhalifa Economic Zones Abu DhabiFleet storage, maintenance and mobilisation

PROJECTS DELIVERED AND SERVICED IN

  • UAE
  • Saudi Arabia
  • Oman
  • Kuwait
  • Qatar
  • Bahrain
Head officeYard

1,250 kVA generators.
Scaled to multi-MW plants.

011,250kVAAvailable modules

Each module pairs a Cummins engine with a Stamford alternator inside a 20 ft sound-attenuated ISO container, with an integrated day tank, main circuit breaker and digital controller.

At 0.8 power factor one module delivers about 1 MW, so a plant is planned in roughly 1 MW steps. The walk-in container travels on a standard trailer for fast mobilisation.

0250 / 60HzProject frequency

The UAE, Oman, Kuwait, Qatar and Bahrain run at 50 Hz; Saudi Arabia and some oil & gas and marine installations use 60 Hz.

Frequency, voltage (LV, or MV through step-up transformers) and protection settings are defined during engineering for the connection point and the connected load, including motor starting currents, then proven on load at commissioning.

03Multi-MWin parallelSynchronised plants

Modules are linked through synchronising controllers and a power management system, share load automatically and operate in parallel on a common bus.

Units start and stop to follow demand, keeping each engine in an efficient load range. With N+1 redundancy one module can be serviced or trip without interrupting supply.

0412+monthsPurpose-built fleets

A project does not have to fit the equipment already in our fleet. For contracts generally from 12 months, SINTAQA procures a dedicated fleet in the required rating and quantity, for example fifteen 100 kVA units for a two-year project.

Procurement, configuration, delivery and service are priced as one package: monthly rental, preferential long-term rates or lease-to-own.

From site survey to commissioning.
Five clear stages.

01UnderstandLoad, energy source, site and operational requirements.

We start with the real situation on site: continuous and peak load, motor starting currents, voltage and frequency, the connection point, required running hours and the redundancy the operation needs.

We also look at site access, available space, fuel supply, ambient conditions and any hazardous-area classification, as well as the schedule and the rental or contract period.

ResultClear load and site brief

02EngineerGeneration configuration, single-line diagram, protection and layout.

Our engineers size the plant around the load, not the other way round: the number of 1,250 kVA modules, N+1 redundancy, 50 or 60 Hz, LV or MV through step-up transformers.

The proposal includes a single-line diagram, protection settings, cable schedule, fuel tank sizing and a site layout, with a clear commercial offer for the full scope.

ResultConfiguration, SLD and commercial offer

03DeployTransport, positioning, cabling and electrical connection.

Containerised generators, transformers and fuel tanks are mobilised from our equipment yard in KIZAD, Abu Dhabi, by trailer to sites across the UAE, including island and marine locations.

Our team handles offloading and positioning, lays and terminates power cables, installs the fuel system and connects the plant to your switchboard or distribution network.

ResultPlant installed and connected

04CommissionTest, synchronise and bring the system online under load.

Before handover each unit is checked, protection is tested and generators are synchronised to share load on a common bus. The plant is then proven on load, with load bank testing where required.

Where the client or utility requires it, commissioning is witnessed by an approved engineer, and you receive the test records and handover documentation.

ResultPlant online under load

05OperateMaintain, monitor and support the plant throughout the contract.

For the full rental or contract period we carry out scheduled maintenance to engine manufacturer standards, coordinate fuel deliveries and respond to alarms and breakdowns, with on-site operators where needed.

At the end of the term we disconnect, demobilise and remove all equipment, leaving the site clean.

ResultReliable power for the whole contract

Request a generator rental quote

Tell us the required power, location and rental period. We will come back with a configured offer.

By submitting the form, you agree to the privacy policy.
Large-scale power project guide & FAQsExplore the details

Large-scale generator rental in Dubai and the UAE

SINTAQA focuses on high-capacity and project-based power. Our available rental fleet consists of containerised 1,250 kVA generator modules for 50 Hz and 60 Hz systems. Multiple modules can synchronise, share load and operate in parallel on a common bus to form a scalable power plant.

We configure the complete system around the project load, voltage, redundancy requirements, site conditions and operating period. The scope can include generators, fuel systems, LV and MV distribution, transformers, synchronising controls, cabling, commissioning and long-term operational support.

Purpose-built fleets for long-term projects

A project does not have to match the equipment already in our fleet. For long-term contracts, generally from 12 months, SINTAQA can procure a dedicated fleet in the required rating and quantity. For example, a two-year project requiring fifteen 100 kVA units can be evaluated as a project-specific fleet rather than a short-term spot rental.

Procurement, configuration, delivery and service are planned as one commercial and technical package. Final availability and terms depend on the project specification, location, schedule and contract duration. Learn more about our diesel power solutions.

Diesel, gas, HFO, solar and hybrid power projects

SINTAQA develops power solutions around the available energy source and the customer's load. Depending on the project, this can include diesel generation, natural gas, CNG, LNG, associated gas, HFO, solar generation or a hybrid system combining more than one technology.

Our role can cover feasibility, system design, equipment procurement, electrical integration, commissioning and long-term operation and maintenance. Each proposal is subject to technical and commercial assessment; the technology and equipment are selected for the actual site and operating profile.

Information needed to configure a power project

  • Required continuous and peak load
  • Voltage, frequency and connection point
  • Load profile, motor starting currents and redundancy target
  • Available fuel or renewable-energy resource
  • Site location, access and environmental conditions
  • Required start date and operating period

How to request a project proposal

Send the available project data through the request form. We will review the load, duration, site and energy source, then define the generation concept, equipment scope and next technical steps.

FAQs

What generator capacity is currently available?

The current rental fleet is based on containerised 1,250 kVA modules. They can operate as individual units or as a synchronised multi-unit power plant.

Can SINTAQA provide smaller generators?

Yes, for suitable long-term projects. Where the required rating or quantity is not already in the fleet, we can evaluate procurement of dedicated equipment as part of a contract generally starting from 12 months.

Can several generators operate together?

Yes. Generator modules can synchronise and share load through dedicated control links, then operate in parallel on a common bus.

Are 50 Hz and 60 Hz configurations available?

Yes. The required frequency is defined during project engineering and equipment selection.

Does SINTAQA work only with diesel generation?

No. We also evaluate gas, HFO, solar and hybrid power solutions according to the available energy source, project load and commercial model.

WhatsApp