DIESEL GENERATORS
Gas Power Generation Plant porject-1
The gas piston power plant was put into operation in March 2018. This project includes the construction, operation, technical and service maintenance of the equipment of a gas piston power plant with an installed capacity of 20 MW (13 units based on the Cummins QSV91G engine). This power plant is used as the main source of electrical energy to supply the Customer's technological needs, the main consumers of which are oil wells. The period of operation of the energy complex in accordance with the concluded agreement is from 01.09.2019 to 31.12.2030.
Gas Power Generation Plant porject-2
Gas piston power plant with an installed capacity of 12 MW. This project included the implementation of the "Turnkey" project - design, construction, purchase and installation of all technological equipment with subsequent operation. The gas piston power plant was implemented on the basis of the Caterpillar gas piston power plant, and was put into operation in June 2018. This power plant operates in parallel with the UPS, which ensures the reliability and uninterruptible power supply. Due to the high efficiency of this project, the Customer decided to expand the capacity of the existing power plant from 12 MW to 22 MW. Thus, in 2024, our company put into operation the 2nd stage of the gas piston power plant, which increased the power plant's output by approximately two times.
Made on
Tilda